Off-line programming of a robot station consisting of two robots, motion systems 2 and 2 positioners. Here it is important to distribute the welds in a good way so that the robots work as much as possible simultaneously. With this operation, so the cycle time is minimized. By using software RS Weld Planner (available for download on the website) so the mission could be implemented in a very good way.